Skip to content
RemontLab
Kitchen with cabinets, hob and extractor

Costs and prices

How much does a kitchen renovation cost in 2026? An 8 m² estimate, cabinet and worktop prices

In an example 8 m² kitchen costing about 57k PLN, cabinets and appliances take over 60% of the budget. We line up job, cabinet and worktop prices and show where to save and where not to.

Redakcja RemontLab9 min read

In a kitchen most of the money goes neither to the crew nor to tiles but to the joiner and the appliance shop. Worth knowing before you sign the cabinet order, because that is where you can save most, or burn the budget.

A bright kitchen with blue cabinets and a wooden worktop
Fronts, worktop and hardware decide the price of made-to-measure units. Photo: NeONBRAND neonbrand, CC0, Wikimedia Commons.

The short answer

Our summary for 10 m²: refresh 25–35k PLN, standard renovation 40–55k, turnkey 60–80k; cenauslug.pl gives about 32k for a budget 9 m² kitchen, 55–70k comfort and over 95k premium.

Total kitchen renovation cost by scope
Fig. 1. Ranges from muratordom.pl (10 m²) and cenauslug.pl (9 m²); the latter also gives about 32k PLN for a budget kitchen and over 95k PLN for premium.

Example: 8 m² for about 57k PLN

muratordom.pl: cabinets 24k (about 42%), labour 12k (21%), appliances 11k (19%), tiles and finishing 5.5k (10%), electrics and plumbing 4.5k (8%). Cabinets and appliances together exceed 60%.

Cost split of an example 8 m² kitchen
Fig. 2. Example from muratordom.pl; percentages computed from the amounts given.

Prices that matter

Chain-store kitchens run about 600–1,000 PLN per running metre, made-to-measure 1,400–3,500 (budget to mid) and 6,000–7,000 (luxury) per kb.pl; cenauslug.pl averages about 3,200 PLN/m in 2026 (laminate fronts 2,800–3,800, lacquer 4,200–6,000, veneer 5,500–8,000, solid oak 9,000–14,000). Electrics for a whole kitchen cost 2,500–4,500 PLN, moving a plumbing point 250–450, a skip 800–1,500.

Chart of kitchen worktop prices
Fig. 3. Worktop price ranges per cenauslug.pl (2026): the worktop choice can move the budget by thousands of PLN.

The worktop alone can move the budget by thousands: laminate 150–400 PLN/m against sintered quartz 2,000–4,000.

Save here, not there

Save on simpler fronts, fewer tall and corner units, and a laminate worktop. Do not save on electrics, plumbing, fitting, hinges and runners. Keep a 10–15% reserve.

Try the kitchen renovation calculator for your own size.

The order of work in a kitchen – and what to do before ordering units

  1. Plan and measure. Design the layout with a designer or the furniture maker; unit heights and widths, plumbing points and appliance spaces follow from the design.
  2. Strip out old units, tiles, wallpaper; remove rubble.
  3. Installations: electrics (separate circuits for hob, oven, dishwasher), plumbing, drains, possibly gas and ventilation.
  4. Plaster, screed, skim coat, floor.
  5. Order units – after plastering, when dimensions are certain (made-to-measure kitchens take about 3–5 weeks per kb.pl).
  6. Tiles and splashback, painting, floors.
  7. Fit units, worktop and appliances, silicone, connections.

Chain store or made to measure – when which

Per kb.pl a chain-store kitchen is 600–1,000 PLN per running metre and made to measure from 1,400 PLN/m (budget) to 6,000–7,000 PLN/m (luxury). Chain stores suit a simple, regular kitchen of standard dimensions; go made to measure for angles, niches, unusual heights or when you want to choose the hardware. muratordom.pl notes that for a joiner's furniture the price is driven by shape, fronts, worktop, hardware, hidden construction (board thickness, edge protection) and whether fitting is a separate line.

Appliances: built-in or freestanding

In the muratordom.pl example appliances were about 19% of the budget (11k of 57k PLN), and the general share is 15–30%. A basic set (hob, oven, hood, fridge, dishwasher) can cost from a few to over ten thousand zloty. Choosing appliances at the design stage matters: niche sizes and connections must fit, and replacing later costs.

Worktops compared

Laminate is 150–400 PLN/m, wood 600–1,200, quartz composite 1,500–2,500, granite 1,800–3,000 and sintered stone 2,000–4,000 PLN/m (cenauslug.pl). Laminate is cheap but less resistant to moisture at the edges; stone and sintered are durable but dear and heavy. Over 4 m the gap between laminate and sintered stone is 7–14k PLN – one of the easiest lines to adjust to a budget.

Hidden kitchen costs

  • Skip, carrying materials, disposal of old appliances.
  • Moving a plumbing point (250–450 PLN) and capping gas (300–600 PLN).
  • New electrics (2,500–4,500 PLN for a whole kitchen).
  • Ventilation – a grille or a new duct.
  • Under-cabinet lighting and trims.
  • Levelling walls and floor for the units.

What you can do yourself

Stripping out, painting and removing rubble are easy to do yourself and cut the labour bill. Entrust electrical and gas installations to licensed people – bad work risks fire or a lost insurance claim. Leave fitting the units and worktop to the maker's crew, since it often ties into the guarantee.

Cost your own kitchen with the kitchen renovation calculator and the wiring with the electrical points calculator.

Estimates from other sites

SiteWhat it saysNote
muratordom.plAn 8 m² kitchen for about 57k PLN: cabinets 24, labour 12, appliances 11, tiles 5.5, installations 4.5k; typically 30–40k, sometimes over 60kCabinets and appliances >60%
cenauslug.plA 9 m² kitchen: budget about 32k, comfort 55–70k, premium >95k; prices of work and worktops2026 and earlier versions differ
kb.plChain store 600–1,000 PLN/m, made to measure 1,400–7,000 PLN/m; a 3–5 week waitRange depends on finish

Checklist before ordering a kitchen

  1. Measure the room after plaster and screed.
  2. Fix the appliances before designing the units.
  3. Ask for an estimate split into carcasses, fronts, worktop, hardware and fitting.
  4. Check the guarantee and service.
  5. Book an electrician and plumber for fitting days.
  6. Plan acceptance and fixes.

Frequently asked questions

How much does a 10 m² kitchen renovation cost?

A refresh is about 25–35k PLN, a standard renovation 40–55k and turnkey 60–80k or more.

How much does a made-to-measure kitchen cost per running metre?

From about 1,400 PLN/m (budget) through 2,500–3,500 (mid) to 6,000–7,000 (luxury); chain stores 600–1,000 PLN/m.

When should I order kitchen units?

After plaster and screed, when dimensions are certain; lead time is about 3–5 weeks.

Sources and real examples

The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.

  1. muratordom.pl – 8 m² kitchen for 57k PLN
  2. cenauslug.pl – kitchen renovation cost 2026
  3. kb.pl – made-to-order or chain-store kitchens

Redakcja RemontLab

The desk collects prices, checks formulas and cites every number.

Did you like this guide?

Get the next ones once a month.

See also