Bathroom renovation calculator
Work out the cost of a bathroom renovation in 2026: tiles, labour, plumbing, electrics, fittings and a reserve. Ranges for budget, mid-range and premium.
Itemised estimate split into labour and materials, with a contingency
How this calculator works
Tiled area is the floor plus the walls (perimeter × tile height, minus the door) with 10% waste. Every line is a range: labour is multiplied by a city factor, materials by the standard (0.8 / 1.0 / 1.45).
Rates are 2026 averages: tile removal 70–100 PLN/m², laying 110–160 PLN/m², a new plumbing point 350–500 PLN, moving a point 800–1,000 PLN, an electrical point 150–260 PLN. A reserve is added because surprises in bathrooms are the rule, not the exception.
Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.
Frequently asked questions
How much does a 5 m² bathroom renovation cost?
In 2026 typically 17,000–30,000 PLN gross at mid-range, depending on tiles, city and whether you move the plumbing.
Why is a bathroom expensive per m²?
It packs the most wet and precision work into the smallest area: waterproofing, cutting tiles, installations and fitting ware. Small bathrooms cost more per m² than large ones.
How long does a bathroom renovation take?
Usually 3–4 weeks, 5–6 with plumbing changes. Good crews are often booked months ahead.