Materials and quantities3 min read
new tool
Kitchen renovation calculator
Estimate a 2026 kitchen renovation: made-to-measure or ready-made cabinets, floor, splashback, electrics, plumbing and appliances, itemised.
Shows how much of the budget cabinets and appliances take
How this calculator works
Each line is a range: labour is multiplied by a city factor, materials and cabinets use 2026 market prices (made-to-measure 3,500–5,000 PLN per running metre, ready-made about 1,000–1,600).
Appliances are an estimate by price tier. In a typical 10 m² kitchen the total is in the tens of thousands of PLN and cabinets plus appliances are the biggest part.
Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.
Frequently asked questions
How much does a 10 m² kitchen cost?
A refresh is about 25–35k PLN, a standard renovation 40–55k and a turnkey kitchen 60–80k or more.
Which costs more: kitchen or bathroom?
The kitchen costs more in total, the bathroom more per m². In a 45 m² flat renovation the kitchen can take up to 40% of the budget.