Skip to content
RemontLab
Illustration: Wallpaper calculator

Wallpaper calculator

Calculate the number of wallpaper rolls for a room. It considers wall perimeter, height, roll width and length, the pattern repeat and window and door openings.

Enter the details

m

A 4×3 m room has a 14 m perimeter.

m
m²

Printed on the label. Plain = 0.

How this calculator works

The number of strips is the wall perimeter divided by the roll width (reduced for windows and doors). Strip length is the wall height plus the pattern repeat plus 10 cm for trimming.

Each roll gives as many strips as fit in its length. Rolls needed is strips divided by strips per roll, rounded up; for buying we add a 10% reserve for cutting mistakes, pattern matching and later repairs.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

What is a wallpaper pattern repeat?

It is the distance after which the pattern repeats. Matching the pattern means each strip is offset, so you need longer strips and more wallpaper.

Should I subtract windows and doors?

For large openings yes – the calculator deducts their area. For small windows it is safer to ignore them to keep a reserve for cuts.

How much wallpaper paste do I need?

One pack of paste usually covers several rolls – the paste maker gives exact use. For non-woven wallpaper, apply the paste to the wall, not the paper.

Also count