Skip to content
RemontLab
Illustration: Tile calculator

Tile calculator

Count tiles, packs, adhesive and grout, allowing for the layout pattern, joint width and waste. For bathrooms, kitchens, hallways and terraces.

Tiles, adhesive (trowel notch) and grout in one, with layout waste

Enter the details

m²

Floor + walls. Subtract doors and windows, add WC frames and niches.

cm
cm
mm
mm

At least 2 mm; rectified tiles are usually laid with 2–3 mm.

m²

0 = do not count boxes.

How this calculator works

We multiply the area by a waste factor: 7% for straight layouts, 12% diagonal and 15% herringbone. Under 5 m² we add 3 more percentage points. The result is divided by the area of one tile including its joint.

Adhesive use depends on the trowel notch size (2 kg/m² for a 4 mm notch up to 6 kg/m² for 12 mm; a medium trowel is about 5 kg/m² in some guides) and surface flatness. Grout is (length + width) ÷ (length × width) × thickness × joint width × 1.6 kg/dm³, plus 10% for losses.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

How many tiles for a small bathroom?

A 4 m² bathroom tiled floor to ceiling is usually 15–20 m² of tiling. For a straight layout add about 10% (7% + 3% for a small room) and round up to full boxes.

How much waste should I allow when tiling?

About 7% for straight laying, 10–12% diagonal and 15% herringbone. Large formats and rooms with many corners need a bigger reserve.

How much adhesive per m² of tiles?

From about 2 kg/m² for mosaic up to about 6 kg/m² with a 12 mm notch. For 60×30 cm tiles and an 8 mm trowel that is roughly 4 kg/m² (more for large formats fixed to both the floor and the tile).

Also count