Skip to content
RemontLab
Illustration: Plaster & skim calculator

Plaster & skim calculator

Work out plaster or skim coat consumption from area and layer thickness. Results in kilograms and bags with a reserve.

Enter the details

m²
mm

Plaster: 10–15 mm. Skim: 1–3 mm.

How this calculator works

Consumption = area × layer thickness (mm) × use per mm (kg/m²). We assume about 1.0 kg/m² per mm for gypsum plaster, 0.8 for lightweight, 1.6 for cement-lime and 1.7 for ready-mixed skim.

We add 10% for losses and uneven walls, then round up to whole bags.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

How much skim coat per m²?

With a 2 mm layer that is about 2 kg/m². For 50 m² of walls you need about 100 kg, i.e. 5 bags of 20 kg (with reserve).

Plaster or skim – what is the difference?

Plaster levels walls (usually 10–15 mm); skim coat is a thin layer (1–3 mm) for painting. Both can be used in sequence.

Do I need to prime before plastering?

Yes, primer evens out absorption and improves adhesion. Use a primer suited to the material (e.g. bonding primer under gypsum on concrete).

Also count