Materials and quantities3 min read
Concrete calculator
Work out the volume of a slab, footing or columns and the cement, sand, gravel and water for grades B15–B30. See whether ready-mix is worth it.
Slab, footing or columns – with the per-m³ recipe and a ready-mix verdict
How this calculator works
Slab volume is length × width × thickness. For a footing: total length × width × height. For round columns: π × (diameter ÷ 2)² × height × number of columns. An optional 5% reserve is added.
The mix is taken per 1 m³ of concrete: for B20 about 300 kg cement, 780 kg sand, 1150 kg gravel and 170 l water (about 2400 kg/m³ in total). Higher grades use more cement.
Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.
Frequently asked questions
How much concrete do footings need?
For a 50×40 cm footing with 36 m total length that is 7.2 m³, or about 7.6 m³ with a 5% reserve. Enter your own dimensions and the calculator converts it to cement, sand and gravel.
How many bags of cement per m³ of concrete?
For B20 concrete it is about 300 kg of cement, or 12 bags of 25 kg per m³. About 14 bags for B25 and 15 for B30.
When should I order ready-mix concrete?
When you need more than about 3 m³ or strength and consistency matter (slabs, floors). Mixing yourself makes sense for small elements.