Installations and heating
Air conditioning in a flat: what output, what it costs and whether you need consent
Floor area is only the start of sizing. The 0.1 kW per m² rule, installation costs from several sites and the usual snag in a block: where to put the outdoor unit.
Redakcja RemontLab2 min read
On this page
In summer “should I buy an air conditioner” turns into “how much output”, then into “who will let me hang it”. That is a good order, because the last question often decides everything. Let us take them in turn.

Output: from floor area to real demand
The usual rule is about 0.1 kW per square metre to cool. For a 60 m² flat that is about 6 kW. But not every 60 m² is the same: a south-facing living room and two computers in a study add kilowatts. In such conditions sources mention 8–9 or even 10 kW. In practice do not buy one huge unit “for everything”; size rooms separately (the air-conditioner calculator does that).
Too small a unit runs flat out and never reaches the temperature. Too big one cycles on and off, dries the air worse and uses more power at start-up. “The more the better” is the wrong instinct.
What it costs
The data we found are scattered and come mostly from sites tied to sales, so read them as indicative. Fitting a split alone is 1,500–3,000 PLN per one source, while a site averaging 12 firms' price lists gives about 1,360 PLN. A single room in a block (unit plus fitting) usually costs 4.5–7k PLN in 2026. Per one guide a 60 m² flat's summer electricity bill is 100–200 PLN a month – it depends on how often and how low you set the temperature.
The outdoor unit – where the paperwork starts
The rule every source repeats: if the unit is to hang on the building's facade, consent from the co-op or community is almost always needed. The facade is a common part and its look is protected by the rules. A unit on your own balcony, with no work on common parts, usually needs no consent, but rules differ a lot, so ask first. In some (listed) buildings a regional conservator may be involved too.
Without consent you are left with units that do not go outside (portable ones) – weaker and noisier, but no formalities. This is not legal advice and the rules depend on your building.
Size your room in the air-conditioner size calculator.
Frequently asked questions
Which air conditioner for a 60 m² flat?
Start from about 6 kW (0.1 kW per m²), but with strong sun and equipment 8–10 kW may be needed. Size each room separately.
Sources and real examples
The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.
Redakcja RemontLab
The desk collects prices, checks formulas and cites every number.
Did you like this guide?
Get the next ones once a month.