Costs and prices
Replacing interior doors: what fitting costs and whether to take an adjustable frame
From 266 PLN in one city to 482 PLN on a national average. What is in the price, how an adjustable frame differs from a fixed one and in what order to do the swap.
Redakcja RemontLab2 min read
On this page
Interior doors are a small renovation item that can spoil your mood: the leaf will not close, the frame “bites” into plaster, and the crew claims extra work is needed. Before you buy doors, know what the fitting costs and what comes with it.

Fitting prices – the spread and why
muratordom.pl gives about 266 PLN per door for Katowice (333–360 in some offers) and about 350 PLN for Wrocław with a frame. kb.pl's list for Świdnica has 331–357 PLN for a single-leaf door in normal conditions. The average of 11 contractors' price lists nationally for an adjustable frame is 482 PLN per one site. Why so different? Scope (removal, travel, finishing), city and net versus gross. A single door always works out dearer per piece because the crew charges for the trip.
Removal is a separate line
Per kb.pl removing an old door is about 206 PLN gross and an old frame about 150 PLN. If you only swap the leaf you avoid that – but the new leaf must then fit the old frame, which rarely works.
Example: five doors in a flat
At city prices (266–360 PLN) fitting alone is 1.3–1.8k PLN; at the national average of 482 PLN it is 2.4k. Add removal of the old ones (kb.pl: 206 + 150 = 356 PLN a set), about 1.8k. Our own arithmetic from the rates. We do not give door prices because they depend on model and maker.
Adjustable or fixed frame
An adjustable frame has movable parts that match different wall thicknesses, so it eases replacement in an existing opening and hides wall irregularities. A fixed frame is rigid and cheaper but must match the wall thickness exactly.
When to do it
Interior doors go in after plaster, screed and floors, but best before the final painting: the crew can scratch fresh paint. Narrow passages in old blocks often have non-standard sizes, so order doors after measuring the opening, not by eye.
Add the doors to your budget in the renovation cost calculator.
Frequently asked questions
How much does fitting an interior door cost?
From about 266 to 360 PLN in city price lists; the average of 11 price lists is 482 PLN for a door with an adjustable frame.
Sources and real examples
The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.
Redakcja RemontLab
The desk collects prices, checks formulas and cites every number.
Did you like this guide?
Get the next ones once a month.