Costs and prices
A partition wall: ceramic block, aerated concrete or plasterboard? Cost per metre and how the work differs
You want to separate a bedroom from the living room or carve out a wardrobe. Per-metre rates differ up to twofold, so here is where the gap comes from and when dry construction pays off.
Redakcja RemontLab2 min read
On this page
You are changing a flat's layout: turning a living room with kitchenette into two rooms or carving out a wardrobe. The first question is “what to build the wall from”. The second, “may I at all”. Let us start with the second, since it can be decisive.

Partition or load-bearing
A partition wall can usually be added or moved without community consent if you do not touch common parts, but load-bearing walls must not be touched without a structural survey and often without a permit (details in our block-of-flats guide). Build a new partition only where the slab will carry it, especially in the masonry version.
What labour costs
Price lists diverge sharply. An 11.5 cm ceramic block is 110–150 PLN/m² of labour in one list and only 55–90 in another. Aerated concrete 12 cm is 52–90 PLN/m². Plasterboard: kb.pl gives 92–115 PLN/m² gross (about 104 on average), another list 115–180, while yet another drops to 55–80. The differences come from region, scope (whether services, doors, filling are included) and the fact that the comparisons measure different things.
Materials and extras
For plasterboard, materials come on top of labour: boards, profiles and screws are about 30–50 PLN per m² of finished wall per kb.pl, mineral wool 20–40 PLN/m² (if you want sound insulation), and doors are priced separately, usually 250–450 PLN each. A masonry wall needs mortar, plaster (an extra) and painting.
Example: a 10 m² wall
Ceramic block: 1.1–1.5k PLN of labour alone (0.55–0.9k in the cheaper list), plus mortar, plaster and skim. Plasterboard: 0.9–1.15k labour plus about 0.5–0.9k of materials and wool, about 1.4–2.0k in all – and ready in a few days with no wet work. Our own arithmetic from the price lists.
Which where
- Bedroom from living room: plasterboard with wool – good sound insulation at small thickness.
- Bathroom: masonry, or plasterboard with moisture-resistant board and waterproofing.
- When time and cleanliness matter: plasterboard.
- A weak slab: plasterboard, since it is far lighter.
Count bricks in the brick calculator and boards in the drywall calculator.
Frequently asked questions
How much does a plasterboard partition cost per m²?
Labour about 92–115 PLN/m² gross per kb.pl (other lists 55–180), plus materials 30–50 PLN/m².
Sources and real examples
The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.
Redakcja RemontLab
The desk collects prices, checks formulas and cites every number.
Did you like this guide?
Get the next ones once a month.