Post-renovation cleaning: what it costs, what is included and whether to do it yourself
From 6 to 35 PLN per square metre depending on the site. Where the spread comes from, what is in the price and what costs extra, and how to clean yourself so the dust does not return next week.
Redakcja RemontLab5 min read
On this page
The last stage of a renovation, the easiest to forget in a budget and, after weeks of dust, the biggest reward. Cleaning after a renovation is not ordinary cleaning. Plaster dust packs into skirting grooves, a white haze stays on frames, and sanding dust returns to the air each time someone opens a door.

What it costs
In the results we reviewed the per-metre rates are very scattered. kb.pl gives 6–12 PLN/m², muratordom.pl 250–550 PLN per flat (8–15 PLN/m²) and another price portal 15–35 PLN/m². The same portal notes an empty flat is cheaper to clean (7–13.5 PLN/m²) than a furnished one (9–16), and Warsaw can run over 20% above Lublin or Białystok. Some lists give labour only, with no products or equipment.
Example: a 50 m² flat
Per kb.pl 300–600 PLN, per muratordom.pl 250–550, per the dearest list 750–1,750. The gap makes sense once you ask what is included. Our own arithmetic from the rates.
Included or extra
Usually included: industrial vacuuming of walls, ceilings and floors, then wet washing. Put window washing in the order separately; extras for roof windows or large shop windows are 50–150 PLN each. An oven is 50–100, shop windows and balconies 15–40 per item. Ask the firm for the scope in writing, since a spoken “we'll clean everything” is understood in different ways.
Cleaning yourself: an order that works
- Start at the top: ceilings and upper walls, then furniture, floor last.
- Collect dust dry with an industrial or filtered vacuum; an ordinary one clogs fast.
- Only then wash wet – otherwise dust turns to sludge.
- Wash windows last, since dust from other work settles on them.
- Go over it again a week later: dust “settles” and a new layer appears.
Add cleaning to your budget in the renovation cost calculator.
Frequently asked questions
How much does post-renovation cleaning of a 50 m² flat cost?
Per kb.pl about 300–600 PLN, per muratordom.pl 250–550, up to 1,750 in dearer lists – depending on scope.
Sources and real examples
The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.
Redakcja RemontLab
The desk collects prices, checks formulas and cites every number.
Did you like this guide?
Get the next ones once a month.