Skip to content
RemontLab
Magnifying glass over a flat plan

Planning

Buying a resale flat: what to check before purchase and renovation so you don't overpay

A flat that needs work can be 10–30% cheaper, but hidden defects can eat the whole difference. We combine checklists from several guides and show what the most common problems can cost.

Redakcja RemontLab8 min read

A resale flat tempts with its price, but the costliest defects do not show on one viewing: damp behind fresh paint, tired wiring, leaky windows. Here is a list of things to check before you make an offer.

Old electrical installation in a flat in a block
Old wiring – one of the things worth checking before buying a flat. Photo: Dmitry G, CC BY-SA 3.0, Wikimedia Commons.

Order of checks

Five steps to buying a resale flat
Fig. 1. Order of checks per the pewnylokal.pl, ongeo and muratordom.pl guides.

Documents (land register, fees, deregistration, building documentation) → viewing (smell, stains, mould behind furniture, windows, tapping walls) → inspection (engineer, thermal camera) → estimate → negotiation.

What you see and what needs an engineer

What to check yourself and what to leave to an engineer
Fig. 2. Inspection scope per pewnylokal.pl (a commercial source – treat as a hint, not a price list).

You can spot stains, mould, windows and uneven floors. Hidden damp, wiring and plumbing condition and a written report need a specialist. A fresh cosmetic renovation can hide mould, so ask what was done and when.

What hidden defects cost

Costs of rewiring, windows, bathroom and kitchen
Fig. 3. Ranges from our guides (muratordom.pl, cenauslug.pl, budujemydom.pl); windows: 5 × 2.8–5.5k PLN.

muratordom.pl describes a case where waterproofing flaws raised an estimate from about 100k to over 300k PLN – extreme, but it shows why to inspect before buying. ongeo advises a 10–20% reserve.

Inspection

About 250–750 PLN (muratordom.pl) or 350–700 PLN (ongeo); a full structural survey costs more.

Estimate the renovation before you offer, using the renovation cost calculator.

A viewing checklist, room by room

  • Entrance and stairwell: state of the facade, roof, lift, cellar; damp smell; stains on stairwell walls point to leaks.
  • Living room and bedrooms: windows (damp frames, condensation), draughts, cracks in corners, falling plaster (tap the wall), uneven floors.
  • Kitchen: the gas installation, ventilation (test the draught with a sheet of paper), the cupboard under the sink – leaks and damp.
  • Bathroom: seals, mould in corners and grout, floor fall, ventilation, water pressure and colour.
  • Installations: the number of sockets and circuits, the consumer unit, the age of wiring (aluminium conductors and no earthing are red flags), condition of water risers.
  • Heating: radiators, valves, heat source, monthly costs.

Documents you must see

  1. The land register – owner, co-owners, mortgages, easements (including a life-long right of residence).
  2. A certificate of no arrears from the manager; the level of fees and the renovation fund.
  3. The energy performance certificate (mandatory on sale).
  4. Certificate of deregistration of people registered at the address.
  5. Building documentation: any unauthorised construction, planned works (roof, facade, installations) and community resolutions.
  6. Last year's bills – real utility costs.

Spotting damp and mould yourself

Damp is the costliest hidden defect. Look for: a musty smell, dark patches on the ceiling and in corners, peeling wallpaper, blistered paint, salt efflorescence, condensation on glass. Mould often “hides” behind furniture or a freshly painted wall – ask about the renovation history and look behind wardrobes. pewnylokal.pl warns that a fresh cosmetic redecoration can be a cover for a problem. A thermal camera (at an inspection) shows damp invisible to the eye.

When to order an inspection

An inspection makes sense whenever the price is suspiciously attractive, the building is over about 20 years old, the installations look original, or you plan a general renovation on which the budget depends. The cost (250–750 PLN per muratordom.pl; 350–700 PLN per ongeo) is small against hidden defects worth tens of thousands. The inspector's report also lets you negotiate: subtract the cost of repairs from the asking price.

Cosmetic or general renovation – decide before buying

muratordom.pl distinguishes a refresh from a general renovation. A cosmetic job suffices when installations are sound and the layout suits you (painting, floors, small repairs). A general one is needed when you change the layout, move installations or replace worn ones; then use our guides to the cost of flat, wiring, window and bathroom renovation to estimate the budget before offering.

Estimate the renovation in the renovation cost calculator and subtract it from the price when negotiating.

SiteWhat it saysNote
pewnylokal.plChecking installations, windows, surfaces, the building; a thermal camera; questions for the seller; a report with a repair estimateThe firm offers inspections
ongeoA flat needing work 10–30% cheaper; reserve 10–20%; an inspector about 350–700 PLN; land register, energy certificate, documentationA property-services firm's blog
muratordom.plRenovation or a lift; an appraiser's inspection 250–750 PLN; a case where the estimate rose from 100k to over 300k PLNAn extreme example

Checklist before an offer

  1. View the flat at different times of day.
  2. Ask for documents and check the land register.
  3. Order an inspection if the price is “suspiciously” low.
  4. Estimate the renovation in the calculator.
  5. Subtract it from the price when negotiating.
  6. Keep a 10–20% reserve.

Negotiating with the report in hand

An inspection report turns a feeling (“it looks tired”) into a list with costs, and that is what makes a price discussion possible. Present it calmly: thank the seller, name the three biggest items, show the estimate for each and propose a figure rather than a percentage. Sellers often accept a reduction for defects a buyer has documented, because the alternative is another round of viewings. If they refuse, you still gain: the list is your renovation budget and your priority order. Keep a 10–20% reserve on top, since a report cannot see inside every wall.

Frequently asked questions

How much is a pre-purchase inspection?

About 250–750 PLN per muratordom.pl and 350–700 PLN per ongeo – indicative.

Which documents to check when buying a resale flat?

The land register, a certificate of no arrears, the energy certificate, certificate of deregistration and the building documentation.

How do I spot damp in a flat?

By a musty smell, dark patches, blistered paint and condensation on windows; hidden damp is found by an inspector with a thermal camera.

Sources and real examples

The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.

  1. pewnylokal.pl – what to check before buying
  2. ongeo.pl – a flat to renovate: what to look at
  3. muratordom.pl – renovation or a lift: an architect's guide

Redakcja RemontLab

The desk collects prices, checks formulas and cites every number.

Did you like this guide?

Get the next ones once a month.

See also