How much does turnkey flat finishing cost in 2026? Price per m², examples and VAT
One site gives 1,800–3,500 PLN/m², others 1,700–3,000. We line up the ranges, a 55 m² flat at 73,500 PLN and explain why developer packages come out differently.
Redakcja RemontLab9 min read
On this page
“How much per metre?” is the first question and the worst defined, since some count only the crew and others furniture too. Before comparing offers, find out what each covers, because the gap can reach tens of thousands.

Ranges
muratordom.pl (2026): about 1,800–3,500 PLN/m²; economy 1,000–1,500, mid 1,500–2,500, premium over 2,500. cenauslug.pl's higher figures (about 2,200 / 3,000 / 4,500+) include furniture. Warsaw, Kraków and Wrocław add 20–30%.
A 50 m² flat at mid-range
muratordom.pl: 90–130k PLN, 6–12 weeks, 10–20% reserve. Our own arithmetic: 50 × 1,500–2,500 = 75–125k, plus reserve gives 100–155k PLN.
Kitchen and bathroom take 40–70% of the budget.
A 55 m² flat from a price list
kb.pl itemises a 55 m² developer-standard flat (early 2026, Lower Silesia): living room with kitchen about 31k, two bedrooms 20.6k, bathroom 14.4k, hallway 7.5k – about 73.5k PLN in total, roughly 1,340 PLN/m² by our division. A 31 m² studio is 53k (about 1,710 PLN/m²): small flats cost more per metre.
Developer package or own crew
finwire.pl: developer finishing packages are usually 700–2,000 PLN/m² with 8% VAT, while materials bought yourself carry 23%. “Developer standard” has no legal definition – compare the scope in writing.
Try the renovation cost calculator for your flat.
What “turnkey” covers
Turnkey has no single legal definition, so write down in the contract exactly what the price includes. It usually covers: screed and plaster, skim coats, painting, floors (panels, parquet, tiles), the bathroom (waterproofing, tiles, fittings, sanitaryware), the kitchen (tiles, installations, sometimes furniture), interior doors, skirting, lighting and electrical fittings, and a final clean. It often excludes living-room and bedroom furniture, appliances, curtains and décor. That is why two “turnkey” offers for the same flat can differ by tens of thousands of zloty.
Economy, mid, premium – what it means in practice
| Standard | Typical materials | Price range (muratordom.pl) |
|---|---|---|
| Economy | AC3/AC4 laminate, acrylic paints, entry-level porcelain, basic sanitaryware | 1,000–1,500 PLN/m² |
| Mid-range | Vinyl or AC5 laminate, latex, mid-grade porcelain, standard fittings | 1,500–2,500 PLN/m² |
| Premium | Parquet, sintered stone, branded fittings, made-to-measure furniture | over 2,500 PLN/m² |
The materials column is our description of typical choices; muratordom.pl gives price ranges only.
Timeline and schedule
muratordom.pl gives a finishing time of 6–12 weeks, and cenauslug.pl notes crews can be booked 6–9 months ahead. Screed (drying 4–6 weeks before wood) and made-to-measure furniture take longest. Attach the plan and schedule to the contract and tie payments to stage acceptance (see our guides on budget and work order).
Developer standard versus a developer's “turnkey”
finwire.pl explains that developer standard has no legal definition; the information prospectus describes the scope. Developer finishing packages are usually 700–2,000 PLN/m² with 8% VAT, and thanks to bulk buying can be cheaper than doing it yourself; the downside is limited choice. If the prospectus does not describe the finishing standard, you have 30 days to withdraw from the contract (finwire.pl – check your own contract). When buying new, compare the package with an independent crew's offer.
How to vet a “turnkey” offer
- Ask for an itemised estimate, not one sum.
- Check the materials list: brands, classes, thicknesses.
- Ask who buys and transports the materials.
- Agree what is outside the price: furniture, appliances, the entrance door, air conditioning.
- Ask about the guarantee (per finwire.pl: 2 years on the work done) and liability insurance.
- Negotiate the schedule and penalties for delay.
Estimate cost in the renovation cost calculator and compare with our reserve and contract guide.
Where the different per-metre figures come from
| Site | What it says | Note |
|---|---|---|
| muratordom.pl | 1,800–3,500 PLN/m²; kitchen and bathroom 40–70% of the budget; reserve 10–20%; 6–12 weeks | Big cities +20–30% |
| cenauslug.pl | On average 2,200 / 3,000 / 4,500+ PLN/m²; split 52% materials, 36% labour, 12% design; reserve 15% | Higher numbers – with furniture |
| kb.pl | A 55 m² model for 73.5k PLN; a 31 m² studio for 53k PLN | Lower Silesian prices |
| finwire.pl | Developer packages 700–2,000 PLN/m², 8% VAT, 5-year warranty and 2 years on the work | No legal definition of the standard |
Checklist before commissioning turnkey
- Write the scope into the contract by room.
- Fix the material standard and brands.
- Price furniture and appliances separately.
- Agree a schedule and staged payments.
- Book the crew early.
- Keep a 10–20% reserve.
Reading a payment schedule
A fair schedule ties money to finished stages, not to calendar dates: a small advance to start, then payments after installations, after tiling and floors, and a final instalment held back until the defects list is closed. Be wary of a schedule in which most of the price is paid before the plaster goes on, because the leverage then sits with the crew. Photograph each stage before it is covered, and sign a short acceptance note for each payment. If a developer's package is on the table, ask for the same stage-by-stage logic, and keep the written description of the standard it promises.
Frequently asked questions
How much does it cost to finish a 50 m² flat turnkey?
About 90–130k PLN at mid-range per muratordom.pl; with a 10–20% reserve plan 100–155k PLN.
What does turnkey finishing mean?
No single definition – usually everything up to move-in: screed, plaster, floors, bathroom, kitchen, painting; furniture and appliances are often excluded. Write the scope into the contract.
Is a developer's package worth it?
Often cheaper per m² (700–2,000 PLN) with 8% VAT, but with limited choice. Compare the scope with an independent crew's offer.
Sources and real examples
The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.
Redakcja RemontLab
The desk collects prices, checks formulas and cites every number.