Skip to content
RemontLab
Calculator and coins symbolising renovation cost

Costs and prices

How much does renovating a flat in Poland cost in 2026?

A refresh costs about 500–900 PLN/m², finishing a developer-standard flat 1,100–2,000 PLN/m² and a full renovation 2,800–3,900 PLN/m². What drives the price.

Redakcja RemontLab7 min read

“How much does a renovation cost?” is a question whose honest answer begins with “it depends”. We will try to narrow that down to real ranges, show what drives them, and warn you where the money usually runs out.

A kitchen under renovation after the old units were removed
Stripping and rebuilding a kitchen is one of the biggest lines in a renovation estimate. Photo: Stilfehler, CC BY-SA 4.0, Wikimedia Commons.

Three levels of renovation

ScopePer m²50 m² flat
Refresh (paint, floors, no installations)500–900 PLN25–45k PLN
Finishing a developer-standard flat1,100–2,000 PLN55–100k PLN
Full renovation (installations, bathroom, kitchen)2,800–3,900 PLN140–195k PLN
Chart of 50 m² flat renovation costs
Fig. 1. Cost ranges for a 50 m² flat from kb.pl, muratordom.pl and finwire.pl.

Selected job prices (2026)

  • Painting walls and ceilings (labour): 20–40 PLN/m²
  • Skim coat: 40–50 PLN/m²
  • Interior plastering (with material): 120–140 PLN/m²
  • Removing old tiles: 70–100 PLN/m²
  • Laying tiles (labour): 100–200 PLN/m²
  • Fitting laminate flooring: 75–85 PLN/m²
  • New electrical point: 160–200 PLN
  • Moving or replacing a plumbing point: 800–1,000 PLN

Why quotes differ so much

  • City: in Warsaw and Kraków whole-renovation labour is often quoted at 600–800 PLN/m², in smaller cities 350–500 PLN/m².
  • Condition: old installations and uneven walls mean more work.
  • Material standard: premium can add about a third.
  • What the quote includes: some crews include materials, others only labour.
Chart of renovation cost split by stage
Fig. 2. Indicative share of stages in a full renovation (averages).

Keep a 10–15% reserve. In old buildings the real state of installations only shows once plaster is stripped. The cost calculator gives ranges for your size, city and standard.

Real examples: three actual quotes

  • A 55 m² developer-standard flat finished for 73,500 PLN (about 1,340 PLN/m²) – kb.pl.
  • A full renovation of 45 m² priced by Rankomat at about 67,000 PLN – a leaner scope than the 2,800–3,900 PLN/m² resale-flat range.
  • Labour for a whole renovation in Warsaw and Kraków at 600–800 PLN/m² vs 350–500 PLN/m² in smaller cities – finwire.pl.

Where the money goes

The most-cited sources (muratordom.pl, kb.pl, cenauslug.pl, finwire.pl) split a budget similarly: the biggest lines are the bathroom and kitchen, then installations (electrics, plumbing) and floors, and only then painting and small finishes. Labour is usually 40–50% in big cities. It helps one decision: on a tight budget cut finishing materials and scope, not installations.

ScopeWhat it coversExample 50 m²
RefreshPainting, small repairs, new skirtinga few tens of thousands at most (our estimate, depends on condition)
Standard renovationFloors, skim coats, painting, new bathroomabout 75–125k PLN (1,500–2,500 PLN/m²)
General renovationNew installations, screed, kitchen, bathroom90–130k PLN at mid-range per muratordom.pl; over 150k premium

Ranges from our turnkey and kitchen guides; these are 2026 market prices, not an offer.

Why two quotes look so different

  • Scope: one includes materials, another labour only.
  • Material standard: porcelain at 60 PLN/m² and at 300 PLN/m² are different categories.
  • City: Warsaw, Kraków and Wrocław run 20–30% dearer.
  • Condition: uneven walls, old installations and damp add work you cannot see at first glance.
  • Net or gross: renovation services in a dwelling usually carry 8% VAT, but materials bought separately 23%.
  • Timing: in season and on tight deadlines crews charge more.

How to cut cost without cutting quality

  1. Change scope, not installation standard. Leave walls that do not need replacing; renovate only what is worn out first.
  2. Compare quotes line by line. Ask for an estimate split into material and labour.
  3. Buy materials yourself – only if you can size them (use our calculators) and have somewhere to store them.
  4. Plan stages so the crew never waits for materials – downtime costs money.
  5. Keep a 10–20% reserve for what appears after the walls are opened.

Build your own estimate in the renovation cost calculator – choose scope, standard and city for ranges and a reserve.

Four sites, four approaches to cost

SiteWhat it saysNote
muratordom.plA 2026 price list of renovation services; 50 m² at mid-range 90–130k PLN; reserve 10–20%Big cities +20–30%
kb.plFlat renovation in 2026; cost changes in recent yearsPrices rise year on year
finwire.plRenovating a 50 m² flat in 2026: rates and budgetNet/gross differences
cenauslug.plA step-by-step guide to renovation costsScope drives the ranges

Checklist when comparing quotes

  1. Ask for an itemised estimate.
  2. Ask what the price covers (materials, rubble, cleaning).
  3. Check whether amounts are net or gross.
  4. Compare material standards.
  5. Ask about the deadline and guarantee.
  6. Add a 10–20% reserve.

Three questions to ask before you accept any quote

Whatever the total, three answers tell you more than the price. First: is it net or gross, and which VAT rate applies to which part? A crew quoting 8% on labour and 23% on materials you buy yourself ends up with a different bill from one that quotes a single gross figure. Second: what happens when the walls are opened and old pipes or an uneven screed turn out worse than expected? A good contract says how extra work is priced and that it is agreed in writing before it starts. Third: who carries the cost of delays, theirs and yours? If tiles arrive three weeks late, the crew's waiting days should not quietly become your bill. Put the answers in the contract; they are worth more than a 5% discount.

Frequently asked questions

How much to renovate a 50 m² flat?

A refresh is about 25–45k PLN, finishing a developer-standard flat 55–100k PLN and a full renovation about 140–195k PLN.

How much does a 50 m² flat renovation cost in 2026?

A standard renovation is about 75–125k PLN (1,500–2,500 PLN/m²), a general one at mid-range 90–130k; premium over 150k.

Is a 10% reserve enough?

Sources advise 10–20%; in older flats and when changing installations aim for 15–20%.

Sources and real examples

The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.

  1. kb.pl – flat renovation in 2026
  2. muratordom.pl – 2026 renovation price list
  3. finwire.pl – 50 m² flat renovation 2026

Redakcja RemontLab

The desk collects prices, checks formulas and cites every number.

Did you like this guide?

Get the next ones once a month.

See also