Costs and prices2 min read
Renovation cost calculator
Estimated 2026 cost of renovating a flat in Poland: a refresh, finishing a developer-standard flat or a full renovation, by size, standard and city.
Ranges for three scopes, standard and city + a stage breakdown
How this calculator works
We take per-m² price ranges for three scopes: a refresh at about 500–900 PLN/m², finishing a developer-standard flat at about 1,100–2,000 PLN/m² and a full renovation at about 2,800–3,900 PLN/m². These are 2026 averages based on published price comparisons.
We then multiply by a finish factor (budget 0.85, mid 1.0, premium 1.35), a location factor (big cities 1.12, others 1.0, small 0.9) and the floor area. The stage breakdown is an averaged share of cost in a typical renovation.
Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.
Frequently asked questions
How much does renovating a 50 m² flat cost?
In 2026 a refresh is about 25,000–45,000 PLN, finishing a developer-standard flat about 55,000–100,000 PLN and a full renovation with new installations about 140,000–195,000 PLN (mid standard, mid-size city).
Why do quotes differ so much?
Scope, material standard, location and whether the contractor includes materials all matter hugely. Always compare quotes with an identical scope.
How much contingency should I allow?
At least 10%, and 15–20% in old buildings. Only after stripping plaster and opening walls do you see the real state of the installations.