Skip to content
RemontLab
Illustration: Screed calculator

Screed calculator

Calculate cement screed (cement, sand, water) or self-levelling compound (25 kg bags) for a given area and layer thickness, with a reserve included.

Enter the details

m²
cm

Floating screed over insulation: usually 5–8 cm.

How this calculator works

For cement screed the volume is area × thickness. Per 1 m³ we assume about 330 kg cement, 1650 kg sand and 130 l water, plus 5% reserve.

For self-levelling compound use is about 1.8 kg per m² per millimetre of thickness. The result is rounded to 25 kg bags.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

How thick should a screed be?

A floating screed on insulation is typically 5–8 cm, bonded to the substrate 3–4 cm. With underfloor heating usually 6–7 cm in total (about 4.5 cm above the pipes).

How much sand and cement per m² of screed?

For 6 cm you need about 0.06 m³ of mix per m², i.e. about 20 kg of cement and 100 kg of sand.

When can I lay tiles or flooring?

A rule of thumb is about a week per centimetre up to roughly 4 cm, then longer. Check the screed's moisture before laying floors.

Also count