Skip to content
RemontLab
Stairs and a tape measure

Planning

Interior stairs: dimensions, the 2h + s rule and an example for a 2.7 m storey

Comfortable stairs are simple arithmetic, not luck. The 2h + s rule, riser limits from several sources and an example where we work out a whole flight from scratch.

Redakcja RemontLab6 min read

Stairs you can climb without thinking share one trait: every step is identical and fits a human stride. Badly worked-out stairs are felt within a week, because you stumble on the one step a centimetre higher than the rest. So let us start with arithmetic.

A wooden staircase in the palace at Bolestraszyce
Wide, low steps – what a comfortable flight looks like. Photo: Bazie, CC BY-SA 3.0 pl, Wikimedia Commons.

The classic rule: 2h + s = 60–65 cm, where h is the riser height and s the tread depth. It is an adult's stride: twice the rise plus the going should come to about 63 cm. For shorter people use 60, for very tall ones 65. A source's example: 15 cm rise and 30 cm tread give 2 × 15 + 30 = 60.

Step by step: a 2.7 m storey

  1. Measure floor to floor, including the slab: 2.7 m.
  2. Choose the number of risers. With 15, 270 ÷ 15 = 18 cm each.
  3. From 2h + s = 63: s = 63 − 2 × 18 = 27 cm.
  4. There is one tread fewer than risers – 14 – so the run is 14 × 27 = 378 cm.
  5. Pitch: arctan(18 ÷ 27) ≈ 33.7°.
Stair example using 2h + s
Fig. 1. The 2h + s = 60–65 cm rule from guides (63 cm as the average); the example numbers are our own calculation.

If that is too long for your flat, add a riser (each extra one lowers h but lengthens the run) or change to a winder or two-flight stair. All of this is our own arithmetic on sample dimensions, not a design.

Limits in the rules – and why sources differ

In a house the maximum riser is 19 cm per some sources and 20 cm per others; the flight should be at least 80 cm wide. In apartment buildings requirements are stricter (one source gives 17.5 cm). prawo.pl adds that the 2h + s rule is for working out tread depth on interior stairs, not all stairs. Before designing, check the current technical regulation or ask a designer.

Stair step requirements
Fig. 2. Values from guides and commentary (prawo.pl, pewnylokal.pl); sources differ – the current regulation is what counts.

Common mistakes

  • Risers of different heights (especially first and last) – people feel a 1 cm difference.
  • A flight that is too steep because “there is no room”.
  • A flight too narrow to carry furniture.
  • No landing at the top or bottom.
  • Slippery finishes with no anti-slip.

Enter the storey height in the stair calculator to get the number of steps, rise and run.

Frequently asked questions

What formula for comfortable stairs?

2h + s = 60–65 cm, usually 63 cm in practice, where h is riser height and s tread depth.

Sources and real examples

The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.

  1. pewnylokal.pl – stairs: norms and dimensions
  2. muratordom.pl – comfortable stairs and the formula

Redakcja RemontLab

The desk collects prices, checks formulas and cites every number.

Did you like this guide?

Get the next ones once a month.

See also