Materials and quantities3 min read
new tool
Underfloor heating calculator
Calculate pipe length, loops, insulation and the indicative cost of water underfloor heating for pipe spacings of 10, 15, 20, 25 and 30 cm.
Compares 10–30 cm spacings and counts manifold loops
How this calculator works
Pipe use is 1 ÷ spacing per m²: 10 m at 10 cm, 6.7 m at 15 cm, 5 m at 20 cm, 4 m at 25 cm. We add 5% plus the leads to the manifold.
One loop is normally up to about 100 m of pipe, so loops = pipe length ÷ 100. Cost uses 2026 ranges: 20–35 PLN/m² for pipe alone, 120–260 PLN/m² for a complete installed water system.
Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.
Frequently asked questions
How much pipe per m² of underfloor heating?
Usually 5–10 m depending on spacing: 5 m at 20 cm, 6.7 m at 15 cm and 10 m at 10 cm.
Which floor covering suits underfloor heating?
Tiles are best, then vinyl with low thermal resistance. Wood and laminate need lower temperature and manufacturer approval.