Skip to content
RemontLab
Illustration: Radiator size calculator

Radiator size calculator

Choose a radiator output for a room based on area, height, building insulation and heating regime (75/65, 70/55, 55/45, 45/35).

Enter the details

m²
m

How this calculator works

Heat demand is the room volume (area × height) times a W/m³ figure depending on insulation (20–50 W/m³), increased by 8% for each external wall.

A radiator's catalogue output is rated at a temperature difference of 50 K (75/65/20 °C). For lower regimes we convert with Q = Q₅₀ × (ΔT ÷ 50)^1.3.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

How many watts per m² does a room need?

Usually 80–120 W/m² in old buildings, 60–90 W/m² in a typical block and 40–60 W/m² in low-energy houses – depending on ceiling height and external walls.

Is a bigger radiator always better?

With condensing boilers and heat pumps, yes – it allows lower water temperatures and increases savings.

What regime does my system use?

Check your boiler documentation or ask the installer. Older buildings often run 75/65, new ones 55/45 or lower.

Also count