Materials and quantities3 min read
Wall insulation calculator
Count EPS boards plus adhesive, fixings, mesh, primer and render for insulating external walls with an ETICS system, with a margin for cuts and waste.
How this calculator works
Net area is walls minus openings. 100×50 cm boards are 0.5 m² each – we add 5% for cuts. Board adhesive is about 5 kg/m², fixings 6 pcs/m², base coat adhesive about 4.5 kg/m² and mesh with a 10% overlap.
Thin-coat render is about 3.5 kg/m² and primer 0.25 l/m². These are indicative values – the system maker gives exact consumption.
Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.
Frequently asked questions
How thick should wall insulation be?
For new houses typically 15–20 cm of EPS with a lambda of 0.031–0.038. For older buildings 12–16 cm depending on the wall.
How much adhesive per m² for EPS boards?
About 4–5 kg/m² to bond the boards and another 4–5 kg/m² for the reinforcing layer with mesh.
Do I need permission for external insulation?
Ordinary insulation usually needs only a notification (depending on the building and any facade change). Check with the authority or the building management.