Skip to content
RemontLab
Illustration: Drywall calculator

Drywall calculator

Calculate plasterboard sheets, CW and UW profiles, screws, tape and jointing compound for a partition or lining.

Enter the details

m
m

How this calculator works

Board area is length × height × sides × layers. Divide by one board's area and add 10% for waste.

CW studs go every 60 cm (+1 at the end) and UW tracks run along the top and bottom. Per m² of lining we assume about 25 screws, 0.35 kg of jointing compound and 1.3 m of tape.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

How many boards for a 4 m partition?

A 4 × 2.6 m partition boarded both sides with one layer is about 20.8 m² of board, i.e. 8 sheets of 120×260 cm (with reserve).

What stud spacing should I use?

60 cm is standard. With double boarding or taller walls the manufacturer may require 40 cm – always check the system.

How do I prime and finish plasterboard?

After filling joints and screw heads, apply primer and then skim or paint directly. In bathrooms use moisture-resistant primer and paint.

Also count