Skip to content
RemontLab
Illustration: Stair calculator

new tool

Stair calculator

Work out the number of steps, riser height, tread depth and run from the storey height. Checks comfort with the 2h + s rule and draws a section.

Draws your stairs from the side and checks comfort with 2r + g

Enter the details

cm
cm

Comfortable: 16–18 cm.

cm

How this calculator works

Number of risers is the floor-to-floor height divided by the preferred riser (rounded); riser height is the height divided by that number.

Tread depth comes from the stair comfort rule: 2 × riser + tread ≈ 63 cm (a human stride). A stair has one fewer tread than risers.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

What riser height is best?

The most comfortable is 16–18 cm with a tread of 27–30 cm.

How many steps for 270 cm?

At about 17 cm risers: 16 risers of 16.9 cm with a tread of about 29 cm, so a run of about 4.3 m.

Also count