Materials and quantities3 min read
new tool
Electrical points calculator
Plan your wiring: how many sockets, switches and light points each room needs and what it costs at 150–260 PLN per point, with a per-room list.
A per-room list of points in three comfort levels
How this calculator works
For each room type we use a typical number of sockets, light points and switches at the “comfortable” level and scale the minimum and extended versions by 0.7 and 1.35.
Cost is points × 150–260 PLN per point (with material), taken from 2026 price lists. Extra circuits (kitchen, bathroom) are counted separately.
Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.
Frequently asked questions
How many sockets in a living room?
Comfortably about 8–10, including near the TV and any work spot.
How much does an electrical point cost?
In 2026 a new point is usually 160–200 PLN labour only, or 150–260 PLN with material.