Costs and prices
How much does a bathroom renovation cost in Poland in 2026? 7 sources compared
Seven sites, seven different totals. We explain why (net vs gross, per m² vs total), show a realistic 3,000–5,500 PLN/m² range and a line-by-line estimate for a 5 m² bathroom.
Redakcja RemontLab11 min read
On this page
A bathroom is the dearest square metre of a flat: tiles, waterproofing, fittings and crew all meet in one small room. So break the cost into items before anyone gives you one round figure.

The short answer
A standard bathroom renovation costs 3,000–5,500 PLN per m² gross in 2026 (labour and materials together): about 13–17k PLN for 3 m² without premium fittings, 17–30k PLN for 4–5 m², and 22–35k PLN for 6 m² at mid-range. Premium finishes start at 6,000 PLN/m².
Why every site gives a different number
- Net or gross. Residential renovation usually carries 8% VAT, yet some price lists are net and others gross.
- Per m² or total. Small bathrooms cost 20–30% more per m² because fixtures and plumbing points do not shrink with the room.
- What is included. Skip hire (400–900 PLN), carrying materials without a lift (300–500 PLN), design and furniture are often extra.
- Plumbing scope. Keeping the pipes where they are can cut 15–20%.
A 5 m² estimate, line by line
For a 5 m² bathroom tiled to 2 m with a walk-in shower, wall-hung WC, vanity and towel radiator, no plumbing changes, our bathroom calculator gives about 17–29k PLN gross. The budujemydom.pl example splits it differently – removal 1,560, plaster 2,000, wall tiling 2,560, moving two plumbing points 1,700, furniture 2,000, reserve 2,500, total 24,860 PLN – but lands in the same range.
Hidden costs
- Skip hire 400–900 PLN and carrying 300–500 PLN without a lift.
- 2–3 weeks of screed drying if the floor is re-poured.
- 10% spare tiles; large-format tiles may need a suction lifter.
- Radiators, lights, shelves and door fitting are often priced separately.
- Old buildings: pipe replacement or mould removal can add several thousand PLN.
- Keep the plumbing in place (15–20% saving).
- Tile only the wet zones and paint the rest.
- Buy materials yourself (1,500–3,000 PLN) and watch for outlet tile ends.
- Keep a good bath or basin (3,000–6,000 PLN).
- Renovate November–February, when labour can be 10–20% cheaper.
- Rubble removal and a skip – removing tiles from a small bathroom is hundreds of kilograms of waste.
- Carrying materials without a lift.
- Ventilation: grille, fan, sometimes a new duct.
- Linear drain, trap, concealed valves – parts that stay for years; do not buy the cheapest.
- Levelling walls and floor before tiling – a frequent extra in old buildings.
- Underfloor heating or a towel radiator if planned.
- Ask for an estimate split into items (demolition, waterproofing, tiling, fittings).
- Ask for a guarantee on waterproofing and tiling – a few years is a sensible minimum.
- Photograph the installations and waterproofing before they are covered with tiles.
- Agree a schedule and staged payments (see our budget and contract guide).
- Ask who buys materials and who is responsible for quantities.
- Decide: shower or bath; plan a linear drain and ventilation.
- Order waterproofing and ask how many coats the crew applies.
- Count tiles with a reserve (see the tile guide).
- Choose concealed fittings and check spare-part availability.
- Ask the crew for a guarantee on waterproofing and tiles.
- Photograph installations and waterproofing before covering.
- Plan rubble removal and carrying of materials.
How to save without lowering quality
Never save on waterproofing, adhesive, grout or the WC frame – repairs mean breaking out the tiles.
Schedule and contract
Expect 3–4 weeks, 5–6 with plumbing changes. Get a written itemised estimate, pay no more than 30% up front, ask for at least a 2-year warranty and a 24-hour pressure test of new pipes.
Try the bathroom renovation calculator for your own size and standard.
The order of work in a bathroom – and why it affects price
A bathroom depends on order more than any other room. Every plan change after the tiles are removed costs money, because the crew goes back to stages already done. The typical order: demolition → moving plumbing and electrical points → levelling walls and floor → waterproofing (liquid membrane, tapes in corners and round the drain) → tiles → grout and silicone → fitting sanitaryware and taps → lighting and ventilation. Waterproofing is invisible, so it is easy to “save” on – and that is exactly the mistake that gives your neighbour a flooded ceiling years later. Do not let the crew skip it or reduce the number of coats.
Hidden items missing from budgets
Labour versus materials
In the sources we compared, labour is usually about half of a small bathroom's budget – mainly tiling (110–160 PLN/m² laying in our calculator), waterproofing and installations. Materials are tiles, adhesive, grout, fittings, sanitaryware and furniture. Savings are possible mainly in materials (porcelain instead of expensive large-format tiles, a simpler tap), not in labour and waterproofing.
Shower or bath – the cost effect
A shower with a linear drain and toughened glass can cost more than a simple bath but saves space and eases cleaning. A walk-in shower needs careful waterproofing and a floor falling to the drain (more laborious). A bath is cheaper to fit but takes room. In a bathroom under 4 m² a shower often leaves more space.
How to check a crew's quote
Cost your own bathroom with the bathroom renovation calculator and the tiles with the tile calculator.
Checklist before a bathroom renovation
A rough split of a bathroom budget
In a typical bathroom about half of the budget is labour and the rest materials: tiles, fittings, sanitaryware and furniture. In the sources compared above the biggest lines are tiles (material and laying), waterproofing and installations; the dearer the fittings and sanitaryware, the larger the share of materials. This is our general assessment, not one site's data.
Frequently asked questions
How much does a 5 m² bathroom cost in 2026?
Realistically 17,000–30,000 PLN gross at mid-range.
Why is a bathroom expensive per m²?
It packs the most wet and precision work into the smallest area.
How long does a 5 m² bathroom renovation take?
Usually 2–4 weeks, a good part of which is drying of the waterproofing and screed.
Can I skip waterproofing?
No. It is a hidden but essential layer against leaks; skipping it risks serious damage.
Sources and real examples
The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.
Redakcja RemontLab
The desk collects prices, checks formulas and cites every number.
Did you like this guide?
Get the next ones once a month.