Skip to content
RemontLab
Panel radiator and warm air

Installations and heating

How to size a radiator for a room: formula and example

A 20 m² room with average insulation needs about 2.2 kW of heat, but on a 55/45 °C system the radiator must be rated about 4.4 kW.

Redakcja RemontLab5 min read

A radiator is usually chosen by looks and the size of the niche under the window, but something else decides: how much heat the room loses and so how much it must give to be pleasant in January. Here is how to work it out without being a fitter.

A radiator under the window in a room
A radiator under the window: choose power by the room's heat demand, not by the size of the niche. Photo: gailhampshire from Cradley, Malvern, U.K, CC BY 2.0, Wikimedia Commons.

Step 1. Heat demand

Power = area × height × W/m³ (20–50 W/m³ depending on insulation), plus about 8% per external wall. Example: 20 × 2.6 × 40 × 1.08 ≈ 2,250 W.

Room heat demand calculation
Fig. 1. Step one of sizing a radiator.

Step 2. System temperatures

Catalogue output is rated at ΔT 50 K (75/65/20 °C). At lower temperatures: Q = Q₅₀ × (ΔT ÷ 50)1.3. On a 55/45 °C system the factor is 0.51, so you need about 4,400 W catalogue output.

Required radiator rating by heating regime
Fig. 2. The cooler the system, the bigger the radiator must be.

The radiator calculator performs both steps for you.

Rule-of-thumb output per m² – three insulation levels

Sizing starts with the room's heat demand; only then do you choose a radiator for the installation's water temperatures. Per kb.pl the output needed per square metre is about 70–100 W/m² for very well insulated rooms, 100–150 W/m² for average insulation and 150–200 W/m² for poorly insulated ones. Other sources give 60 to over 100 W/m², which shows these are approximations. For a bathroom muratordom.pl gives even 50–130 W/m², because of the higher target temperature (24 °C) and the humid air exchange.

16 m² roomVery good (70–100 W/m²)Average (100–150)Poor (150–200)
Demand1.1–1.6 kW1.6–2.4 kW2.4–3.2 kW

Our own conversion of kb.pl's ranges. If you have an installation design, the room's output is stated there and that is your best reference.

Water temperatures: 75/65, 70/55 or 55/45?

Catalogues give a radiator's output for set parameters: traditionally 70/55/20 °C (EN 442) or 55/45/20 °C for modern systems. The lower the supply temperature, the bigger the radiator you need for the same output. For houses kb.pl lists condensing boilers (about 55/45/20 °C) and heat pumps (about 50/40/20 °C). In an older block on district heating the parameters can be higher but depend on weather and building – ask the administrator. If you buy from a catalogue rated for other parameters than your installation, correct the output with the manufacturer's factor.

Room temperature changes the output

Designs assume about 20 °C. Per GLOBEnergia at 55/45 one degree changes output by several percent: at 18 °C a radiator gives about 9% more, at 22 °C about 8.8% less. If you like warm rooms (22–23 °C) size with a margin; if you keep a bedroom at 18–19 °C do not overdo it.

Example: a 20 m² living room, 2 m² window, 1980s block after insulation

  1. Average insulation → assume 100–120 W/m² → 2.0–2.4 kW.
  2. Installation 70/55/20 °C – take the catalogue output for those parameters.
  3. Match the width to the window: a radiator 60–80% of the window width spreads heat best.
  4. Pick one with slightly higher output (say 2.5 kW) and a thermostatic valve that throttles it when warm.

An example on typical assumptions; in a real building ask for the installation design.

Types and placement

  • Steel panel – the most common: heat up fast, cheap and many sizes (type 11, 21, 22, 33; more plates means more output at the same width).
  • Towel rails – for bathrooms; usually 300–800 W.
  • Decorative (vertical, aluminium, cast iron) – dearer; make sure the catalogue output matches your parameters.
  • Placement: best under the window, where it counters cold draughts; do not cover it with long curtains or furniture.

Common mistakes

  1. Choosing by the size of the niche instead of the demand.
  2. Using catalogue output for 75/65 on a 55/45 system – the radiator will be too small.
  3. No thermostatic valve and head.
  4. Swapping a radiator in a block without agreeing it with the administration – see our guide on renovating in a block.

Enter dimensions and insulation in the radiator calculator to see the output in kW and for common parameters.

Where other sites get their watts per metre

SiteWhat it saysNote
kb.pl70–100, 100–150 and 150–200 W/m² by insulation; supply parameters for condensing boilers 55/45/20 and heat pumps 50/40/20Indicative values
muratordom.plRadiator output against the water parameters; bathroom 50–130 W/m²Higher bathroom temperature
GLOBEnergiaA 1 °C deviation of room temperature changes output by several percent (18 °C: about +9%, 22 °C: about −8.8% at 55/45)For 55/45 parameters

Checklist before buying a radiator

  1. Check the installation design or the old radiator's output.
  2. Find the water parameters (ask the administrator or installer).
  3. Estimate the room's demand in W/m².
  4. Compare catalogue output for your parameters.
  5. Match the width to the window and choose a thermostatic valve.
  6. Agree the swap with the manager if you live in a block.

Frequently asked questions

How many watts per m²?

Typically 60–90 W/m² in a standard flat, more in old buildings, less in low-energy houses.

How many watts per m² does a room need?

Roughly 70–100 W/m² with very good insulation, 100–150 with average and 150–200 with poor (kb.pl).

What does 55/45/20 mean?

Supply water 55 °C, return 45 °C and room air 20 °C. At lower parameters the radiator must be bigger.

Sources and real examples

The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.

  1. kb.pl – pipe density in underfloor heating (the alternative to big radiators)
  2. kb.pl – how to choose a radiator for a room
  3. muratordom.pl – radiator output and water parameters
  4. GLOBEnergia – room temperature and radiator output

Redakcja RemontLab

The desk collects prices, checks formulas and cites every number.

Did you like this guide?

Get the next ones once a month.

See also

Installations and heating9 min read

Rewiring a flat in 2026: cost, stages and testing

Rewiring a 50 m² flat costs about 11–16k PLN, though some sites quote 4–5k. We explain the gap, when rewiring is necessary and what 5–10 working days with acceptance testing look like.