Skip to content
RemontLab
Cross-section of underfloor heating with pipes in the screed

Installations and heating

Underfloor heating: how much pipe per m², what spacing and what it costs in 2026

At 15 cm spacing you use about 6.7 m of pipe per m², and a complete water underfloor system costs 120–260 PLN/m². Spacing by room, loops, screed and first start-up.

Redakcja RemontLab8 min read

Underfloor heating is comfortable, but its mistakes cannot be fixed without breaking up the floor. Pipe spacing, screed thickness and the first heat-up are three decisions to discuss with the installer before the pipes vanish under the screed.

Underfloor heating pipes laid in loops
Pipes laid in a spiral or meander; spacing depends on the room's output and screed thickness. Photo: Viii23dawari, CC BY-SA 4.0, Wikimedia Commons.

Pipe per m²

Pipe per m² is the reciprocal of spacing; real designs sit at 5–10 m/m²: 10 cm → 10 m, 15 cm → 6.7 m, 20 cm → 5 m, 25 cm → 4 m, 30 cm → 3.3 m. Add the leads to the manifold and about 5% spare. Standard pipe is 16 mm (PE-X, PE-RT or PE) rated to 70°C.

Pipe length per m² by spacing
Fig. 1. Pipe use is 1 ÷ spacing; designs typically sit in 5–10 m per m².

Spacing by room

Living rooms and bedrooms 20 cm (15 cm at low supply temperature), bathrooms 10 cm, kitchens 25 cm, and closer spacing in edge zones along windows and external walls.

Underfloor pipe spacing by room
Fig. 2. Spacings per kb.pl; exact values always come from the design.

Loops and cost

One loop holds up to about 100 m of pipe, so 60 m² at 15 cm needs about 480 m and 5 loops. In 2026 pipe alone costs about 20–35 PLN/m² and a complete installed system 120–260 PLN/m² – 13–20k PLN for 100 m² without screed.

Underfloor heating cost chart
Fig. 3. 2026 prices per kb.pl and muratordom.pl; about 13,000–20,000 PLN for 100 m² without screed.

Screed and start-up

Cement screed over the pipes totals about 6–7 cm. Wait about 21–28 days, then follow a heat-up programme of a few degrees a day. Always insulate below and fit an edge strip.

Try the underfloor heating calculator for pipe metres, loops and a cost range.

Output and floor temperature – the limits

Underfloor heating runs at a lower water temperature than radiators (typically 30–45 °C instead of 55–70 °C), which is why it pairs with condensing boilers and heat pumps. Surface temperature should not exceed about 29 °C in living areas (about 33 °C in bathrooms) – a figure that caps the floor's maximum output per m². In rooms with big heat losses (large windows, poor insulation) the floor may not suffice alone and a radiator must be added. So before installing it is worth having a design with a heat-loss calculation.

Screed and first heat-up – the critical steps

  1. Pressure test of the pipes before the screed – check for leaks and keep the pressure during pouring.
  2. Screed – cement or anhydrite; the thickness over the pipes depends on the type (see our screed guide).
  3. Drying – no heating for the period the screed maker advises (for example several weeks).
  4. Heat-up programme – gradual temperature rise (typically start at 20–25 °C and raise by about 5 °C a day to the maximum, then step down), per the manufacturer.
  5. Moisture measurement of the screed before laying the floor.

Which floors suit underfloor heating

  • Porcelain tiles – best heat conduction; the usual choice for bathrooms, kitchens and hallways.
  • Vinyl – low thermal resistance; many products are approved for it.
  • Glued parquet – needs a suitably dry screed and a dimensionally stable species.
  • Laminate – choose approved products and avoid a foam underlay.

Common mistakes

  1. Pipe spacing too wide for a room with large losses – the floor does not heat enough.
  2. Loops of unequal length without balancing at the manifold.
  3. No expansion joints and edge insulation.
  4. Heating up too fast, or laying a floor on a damp screed.
  5. No hydraulic design.

Work out pipe, loops and cost with the underfloor heating calculator.

SiteWhat it saysNote
kb.plPipe density in underfloor heating; wet or electric; the 2026 cost; which screedAnhydrite screed about 5 cm above the pipes
muratordom.plThe 2026 cost of wet underfloor heating (labour, with material); a practical guide and watertightnessLabour and material prices separately
cenauslug.plLaying underfloor pipes and fixing on railsPrice depends on the method

Checklist before installing underfloor heating

  1. Commission a design with a heat-loss calculation.
  2. Decide the screed type and thickness over the pipes.
  3. Plan the manifold and zone control.
  4. Do a pressure test before the screed.
  5. Keep the drying time and the heat-up programme.
  6. Choose a floor approved for underfloor heating.

Photograph the pipes before the screed hides them

Take pictures of every loop with a tape measure beside it, and sketch which loop belongs to which manifold circuit. Years later, when someone wants to drill into the floor or a leak appears, that picture is worth far more than the few minutes it took. Ask the installer for the pressure-test record, the pipe type and the heat-up programme in writing; if the screed maker's guarantee depends on that programme, a missing record can void it. Keep the zoning simple too: one thermostat per room avoids the common complaint that the bathroom is warm and the bedroom is not.

Frequently asked questions

How much pipe per m²?

Usually 5–10 m depending on spacing.

What pipe spacing for underfloor heating?

Typically 10–20 cm: closer (10–15 cm) in bathrooms and near windows, wider (15–20 cm) in rooms with small losses.

How long before I can switch the floor on?

After the screed drying period the manufacturer advises, following a gradual heat-up programme.

Sources and real examples

The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.

  1. kb.pl – pipe density in underfloor heating
  2. muratordom.pl – water underfloor heating cost 2026
  3. kb.pl – underfloor heating cost 2026

Redakcja RemontLab

The desk collects prices, checks formulas and cites every number.

Did you like this guide?

Get the next ones once a month.

See also