Materials and quantities
Parquet or laminate in 2026? Laying and renewing prices and the real cost of 20 m²
Parquet costs more up front but can be renewed; panels are cheaper but are replaced sooner. We line up labour, material and sanding prices from several sites and work out which costs less after 15 years.
Redakcja RemontLab8 min read
On this page
Wood is back in fashion, but “parquet or panels” usually ends at looks and skips the bill for the next dozen years. Let us work that bill out on 20 m² so you decide with numbers in front of you, not showroom enthusiasm.

Verdict
- Parquet: durability and renewability – it can be sanded and varnished many times.
- Laminate: lower price and quick fitting, but it cannot be renewed.
- Vinyl: best for moisture and underfloor heating, dearer than laminate.
kb.pl calls wooden floors, especially herringbone, the 2026 trend but cites no sales data – read it as observation, not measurement.
Prices
Labour for laying: laminate 29–42 PLN/m², vinyl 33–74, solid board 75–165, traditional parquet 105–215, French herringbone 130–185 (cenauslug.pl). muratordom.pl gives 55–90 for panels and 90–170 for parquet.
Parquet adds sanding (about 35–48 PLN/m², dust-free 40–52, with two coats of lacquer 80–100 – kb.pl) and, if you replace an old floor, removal (about 32–48 PLN/m²). Material plus laying per kb.pl: pine 180–300, beech 190–400, oak 250–550, merbau 260–600, teak 300–700 PLN/m².
20 m² over time (our calculation)
Oak parquet: 5–11k PLN now plus sanding and two coats of lacquer in about 15 years (1.6–2.0k) = 6.6–13k PLN. AC4 laminate: 2.0–2.6k now plus replacement in about 15 years (2.0–2.6k) = 4.0–5.2k PLN. Parquet only pays off over 25–30 years. If you plan to sell or let the flat, panels often win; if you stay and value the look of wood, parquet defends itself.
Count packs, underlay and skirting with the flooring calculator.
Types of parquet and boards – what you buy
- Solid parquet (strips) – full wood 14–22 mm thick; can be sanded many times, the dearest and most durable.
- Solid board – wide boards of one piece of wood; labour per cenauslug.pl is 75–165 PLN/m² depending on layout.
- Engineered (three-layer) board – a thin noble layer on a stable core; cheaper, less sensitive to humidity changes, can be sanded 1–3 times.
- Mosaic and patterns (herringbone, French herringbone, industrial) – dearer labour: vinyl herringbone 55–115 PLN/m², laminate 60–85, and wooden French herringbone 130–185 PLN/m² (cenauslug.pl).
Why parquet labour costs more
Parquet is three stages: laying (gluing or fixing), sanding and finishing (lacquer or oil). Panels are one stage and floating installation takes a few hours per room. cenauslug.pl adds that substrate preparation is about a third of the work: the screed must be level and dry, and concrete moisture checked with a meter before gluing. Parquet must also be acclimatised for at least 48 hours.
Finish: lacquer or oil
| Lacquer | Oil / hard-wax oil | |
|---|---|---|
| Protection | Hard coating, water resistant | Soaks into the wood, natural look |
| Repair | Harder – whole surface refinished | Easy – spot repair |
| Cost (kb.pl) | sanding + 2 coats about 80–100 PLN/m² | oil on boards about 90–100 PLN/m² |
| Care | Vacuum and a slightly damp mop | Periodic oil maintenance |
Parquet drawbacks that get mentioned less
- Sensitivity to moisture and dry air – gaps in winter, cupping in summer; keep indoor humidity around 40–60%.
- Scratches from furniture and shoes – repaired by sanding, but not free.
- A longer renovation – after sanding and finishing you wait several days.
- Purchase price – oak 250–550 PLN/m² laid, exotics (merbau, teak) 260–700 PLN/m² (kb.pl).
Panels: when they win
Laminate and vinyl win on price (from about 15 PLN/m² material per muratordom.pl), speed of fitting and moisture resistance (vinyl). With a short horizon, a let flat or a renovation “for sale”, panels are often the more rational choice. The drawbacks: they cannot be renewed, and once worn (after several to a dozen years per kb.pl, without clear data) the whole floor must be replaced.
A quick rule
- You stay 20+ years and want the look of wood → parquet or engineered board.
- Rental, budget of a few thousand → AC4/AC5 laminate or vinyl.
- Kitchen, bathroom, hallway with shoes → vinyl or porcelain.
- Underfloor heating → vinyl or porcelain; with wood, glued parquet and the maker's approval.
Work out quantities in the flooring calculator and compare with our vinyl and laminate guide.
How other sites see it
| Site | What it says | Note |
|---|---|---|
| kb.pl | Trend: in 2026 interest in wooden floors, especially herringbone, is growing; parquet as a 10–20-year investment, panels “several, at most a dozen years” | No sales data |
| muratordom.pl | Parquet wins on durability, sound and moisture; glued solid works well on underfloor heating; laminate from about 15 PLN/m² | Some prices from earlier years |
| cenauslug.pl | Detailed labour rates: traditional parquet 105–215, solid board 75–165, laminate 29–42 PLN/m² | Substrate prep is about ⅓ of the work |
Checklist before choosing a floor
- How long will you stay in the flat?
- Is there moisture and underfloor heating in the room?
- Is the substrate level and dry?
- What is the budget for material, laying and finishing?
- Do you want the option of renewing it?
- Buy from one batch and add the waste.
Frequently asked questions
How much does sanding parquet cost?
About 35–48 PLN/m² per kb.pl price lists, or 80–100 PLN/m² with two coats of lacquer.
How long does parquet last?
With good care several decades – it can be sanded many times. Panels are usually replaced after several to a dozen years.
Is parquet dearer than laminate?
Up front yes: oak laid is 250–550 PLN/m², laminate fitted tens to just over a hundred PLN/m². After 15 years the gap narrows because parquet can be renewed.
Sources and real examples
The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.
Redakcja RemontLab
The desk collects prices, checks formulas and cites every number.
Did you like this guide?
Get the next ones once a month.