Skip to content
RemontLab
PVC window with a sun

Costs and prices

How much does replacing windows cost in 2026? PVC windows, warm installation and 3 windows costed

A PVC window itself is 650–1,350 PLN/m², installation adds a few hundred and a turnkey window with sills usually costs 2,800–5,500 PLN. We cost three windows and explain why installation rates vary.

Redakcja RemontLab8 min read

Windows make mistakes easy, because prices come per square metre, per piece, net and gross. Let us put it into one picture and work through a real example: three windows in a flat.

A newly installed window in a freshly finished room
A new window: the installation decides airtightness, not only the glass. Photo: Rory Connolly QS, CC BY-SA 4.0, Wikimedia Commons.

Window prices per m²

cenauslug.pl (2026): PVC triple-glazed 650–1,350 PLN/m², wood 900–1,500, aluminium 1,200–2,000. muratordom.pl's sample window (146.5 × 143.5 cm, Uw about 0.9) is about 1,220–1,780 PLN net in white; anthracite adds 10–30%, woodgrain 27–32%.

Chart of window prices per m²
Fig. 1. Window prices per m² per cenauslug.pl (2026), installation excluded.

Installation

Priced per metre of frame perimeter: about 93 PLN/m on average (54–133) per cenauslug.pl; warm PVC installation by city per muratordom.pl: Warsaw 44–51, Kraków 42–48, Łódź 38–44, Zielona Góra 34–40 PLN/m. Warm installation costs about 30–40% more; removing old frames is another 100–300 PLN per window.

Standard and warm window installation
Fig. 2. Cost difference per the cenauslug.pl comparison.

Three windows costed

Each is about 2.10 m²; three give 6.3 m² and 17.4 m of perimeter: windows 4.1–8.5k PLN, installation 0.9–2.3k, together 5.0–10.8k PLN. Turnkey (sills, flashings, disposal) is 2,800–5,500 per window: 8.4–16.5k PLN for three. Add 8% VAT to net manufacturer prices.

Worked cost of replacing three windows
Fig. 3. Our own calculation on cenauslug.pl rates; the turnkey result is the 2,800–5,500 PLN per window range.

Add windows to the whole budget in the renovation cost calculator.

What warm installation is and why it costs more

Standard installation relies on installation foam around the frame. Warm (layered) installation adds vapour-tight tape on the inside and vapour-permeable tape outside, so the window is airtight without thermal bridges and condensation. It takes more material and work – muratordom.pl says it costs 30–40% more, cenauslug.pl 30–50%. In an insulated building or where energy saving matters it pays back through a lower risk of damp reveals and mould.

Which window parameters to check

  • Uw value of the whole window (for example 0.9 W/m²K in muratordom.pl's example) – the lower, the warmer.
  • Chambers and panes – triple glazing is standard now; check for a warm-edge spacer.
  • Profile width (for example 70–82 mm) and the number of seals.
  • Water- and air-tightness class.
  • Hardware – locking points and micro-ventilation.
  • Colour – white is cheapest; anthracite adds 10–30%, woodgrain 27–32% (muratordom.pl).

PVC, wood or aluminium

PVCWoodAluminium
Price per m² (cenauslug.pl)650–1,350 PLN900–1,500 PLN1,200–2,000 PLN
Installing one (cenauslug.pl)300–800 PLN500–700 PLN600–800 PLN
ProsCheapest, airtight, maintenance-freeNatural look, eco-friendlySlim profiles, large glazing
ConsLess “noble”Needs repainting every few yearsDearer, needs a thermal break

When replacement is justified

Replacement makes sense when windows are leaky (draughts, condensation), have single or old double glazing and rotting wooden frames. If the windows are sound and only a seal has failed, replacing the seals (muratordom.pl publishes a price list) is often far cheaper. When planning, remember wall insulation: new airtight windows in an uninsulated wall can move the dew point and cause mould.

Formalities and safety in a block

In a block, replacing windows inside the flat usually needs no building permit, but some communities and co-ops require consent or a uniform facade look (frame colour, glazing bars). Ask about the rules before ordering (see our guide on renovating in a block). Secure the flat during the swap and plan disposal of the old windows.

How to compare offers

  1. Ask for quotes for the same dimensions, colour and glazing pack.
  2. Check that the quote includes installation, inner and outer sills, flashings, reveal finishing and disposal.
  3. Ask about lead time (usually a few weeks) and the guarantee on windows and fitting.
  4. Ask for an acceptance protocol and check the hardware adjustment.

Add the windows to the whole budget in the renovation cost calculator.

Window prices in other sources

SiteWhat it saysNote
muratordom.plWarm installation by city: Warsaw 44–51, Kraków 42–48, Łódź 38–44 PLN/m; colour +10–30%; prices net, 8% VAT on installationWindows excluding installation
cenauslug.plPVC 650–1,350 PLN/m²; installation averages 93 PLN/m; turnkey 2,800–5,500 PLNWarm installation +30–50%
kb.pl (city price lists)Window installation price lists for selected citiesRates differ by city

Checklist when ordering windows

  1. Measure the openings or have the maker measure.
  2. Fix the material, colour, glazing pack and Uw.
  3. Ask about warm installation, sills, flashings and disposal.
  4. Ask for the lead time and guarantee.
  5. Check the co-op or community rules.
  6. Do an acceptance with hardware adjustment.

Do not forget the sills and the reveals

A window quote often stops at the frame, while the visible result depends on what surrounds it. Ask who finishes the reveals (plaster, filler, paint), who supplies the inner and outer sills, and whether the crew takes away the old windows. In an older flat the reveals often need repair after the old frames come out, and that work is easiest to price before the job, not on the day. Also schedule the swap before painting the room: nothing damages fresh paint like a window crew.

Frequently asked questions

How much does one turnkey PVC window cost?

Usually 2,800–5,500 PLN including installation, sills and flashings.

How much does replacing windows in a 50 m² flat cost?

It depends on number and size; turnkey is 2,800–5,500 PLN per window, so for 5 windows 14–27.5k PLN.

Is warm installation worth it?

Yes if you care about airtightness and no mould on the reveals; it costs 30–40% more but cuts the risk of later repairs.

Sources and real examples

The figures in this guide come from the pages below (accessed at publication). Prices change – check current quotes.

  1. muratordom.pl – window replacement cost 2026
  2. muratordom.pl – PVC window prices by colour
  3. cenauslug.pl – window replacement: types and installation

Redakcja RemontLab

The desk collects prices, checks formulas and cites every number.

Did you like this guide?

Get the next ones once a month.

See also