Skip to content
RemontLab
Illustration: Paint calculator

Paint calculator

Free paint calculator: enter room size, number of coats and the paint's coverage to see how many litres and which tin sizes to buy, with a 10% reserve.

Picks 10 / 5 / 2.5 l cans and shows what is left over

Enter the details

m
m
m

We deduct about 1.85 m² per door.

We deduct about 1.5 m² per window.

Printed on the can as m² per litre for one coat. Typically 10–14 m²/l.

zł

How this calculator works

Wall area is the room perimeter times the height: 2 × (length + width) × height. We subtract doors (about 1.85 m² each) and windows (about 1.5 m² each). If you paint the ceiling, length × width is added.

Paint needed is area × number of coats ÷ coverage (m² per litre). We add a 10% reserve for losses and touch-ups and then choose 10 l, 5 l and 2.5 l cans.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

How much paint do I need for 50 m² of walls?

With two coats and 12 m²/l coverage you need about 8.3 litres, or around 9–10 litres with a 10% reserve – one 10 l can is enough.

Should I subtract windows and doors?

Yes, but only large openings. You can ignore small windows – it just adds a little reserve. The calculator deducts a standard 1.85 m² per door and 1.5 m² per window.

How many coats of paint do I need?

Two coats is the standard. One is enough when refreshing a wall in the same colour; three when covering a dark wall with a light colour or using a cheaper paint with weak coverage.

Also count