Skip to content
RemontLab
Illustration: Flooring calculator

Flooring calculator

Work out how many packs of flooring, how much underlay and skirting you need. The calculator includes waste for straight, diagonal and herringbone layouts.

Packs, underlay and skirting – with a waste chart

Enter the details

m
m
m²

Usually 1.4–2.5 m² – check the packaging.

zł

How this calculator works

We add waste to the floor area: 5% for straight laying along the room, 10% diagonal and 15% herringbone. The result is divided by the pack size and rounded up to whole packs.

For skirting we use the room perimeter minus door widths (about 0.9 m each) plus 5% for cuts, with a standard 2.4 m board. Underlay includes 5% for overlaps.

Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.

Frequently asked questions

How do I calculate flooring waste?

Multiply the area by (1 + waste): 1.05 for straight laying, 1.10 diagonal and 1.15 herringbone. Then divide by the m² per pack and round up.

Do small rooms need more waste allowance?

Yes. In rooms with alcoves, chimney breasts or irregular shapes waste grows – use 10% even for straight laying.

Are flooring and underlay counted separately?

Yes. Underlay is bought by the m² in rolls or boards – the calculator gives the area with 5% for overlaps.

Also count